Portable Compressor Factory Acceptance Test (FAT) Checklist: How to Verify FAD/CFM, Working Pressure, Engine Load, Temperatures, Safety, Noise, Vibration, Controls, Leaks, and Pre-Shipment Documentation
Key Takeaways A portable compressor can look perfect during a factory walk-around and still create problems after arriving at a mine, drilling site or construction project. The machine may reach rated pressure...
READ MORE